Summer Remodel

Its been a long summer but we have a new lobby, office, computer lab and new paint and most of all we have water in the building. Construction is still going on in the east side of the building but we will be ready to go by August 22nd. Look for a Grand Opening on November 2nd. Here are some pictures.

This is the new computer lab.

Remodeled lobby with a door big enough to roll in the 12.5L engine.

New and newly repainted racks in position in the west lab.

This is the old computer lab and now a classroom.

This is the engine store room with new sewer lift pumps.
This is the first time I have seen it empty.

This is the new entry. I wanted to see the 12.5L through the window
but that didn't work out very well.